Student Announcements

Construction+Transportation

Construction at Bowman Drive South Garage entrance
The South Garage entrance, Bowman Drive, and Wyman Park Drive will remain open; flagmen will direct traffic
Construction at Bowman Drive, South Garage entrance
The construction will have an impact on pedestrian and vehicular traffic
Boom truck at Levering Hall on Sept. 11
Flag personnel on Bowman Drive will be directing both vehicle traffic and pedestrians at walkways; Bowman Drive will remain open
Crane pick at Stieff Silver building, Saturday, Aug. 29
A site layout plan showing where the operation will occur and what safety measures will be in place to support pedestrian and vehicular traffic is available
Campuswide fire alarm communication impairment on Tuesday, Aug. 25
A campuswide fire alarm communication impairment is scheduled to begin at 8 a.m. on Tuesday, Aug. 25, to allow for connection of new fire alarm communication cables. Fire alarm pull stations, horns, and strobes will remain active during the outage.
Changed date for boom truck/crane at Levering Hall: now Thursday, Aug. 20
See the site map online for the location of flag personnel directing vehicular and pedestrian traffic on Bowman Drive, which will remain open
Crane pick at Stieff Silver building
A site layout plan shows the safety measures that will be in place to support pedestrian and vehicular traffic during the crane operations on Saturday, Aug. 8
Updated bus and shuttle schedules
Homewood-Peabody-JHMI and Keswick-Homewood-Eastern-JHMI services will increase in frequency starting Monday, Aug. 10
Soil borings by the Wyman Building
The university will be performing soil borings on and adjacent to the Wyman East parking lot starting on Wednesday, June 17. Work is expected to last approximately three days.
Changes to Homewood-Peabody-JHMI and Night Ride schedules, effective Monday, June 15
Homewood-Peabody-JHMI will operate on a new timetable, and Night Ride under new service hours, starting Monday June 15