A crane lift is scheduled at the STSCI Muller building to remove an existing chiller. Work will take place on Monday, Dec. 1.
What to expect:
- A crane will be set up in the STSCI parking lot for the duration of the lift
- San Martin Drive will remain open; no roadway closures are expected
- "Road Work Ahead" signs will be placed along San Martin Drive as a precaution for drivers
We appreciate your cooperation as this important work is completed safely. Please refer to the logistics plan at this link.