As part of the MSE Library Modernization project, on Wednesday, Oct. 1, and Thursday, Oct. 2, a new walkway and overhead coverage will be installed for pedestrians in front of the construction fencing on the beach side. The walkway and overhead coverage will remain in place through Oct. 15.
Additionally, a small part of the Beach directly in front of the MSE Library will be closed until Oct. 15 for the installation of a new hot water line.