Hodson Hall exterior ramp repair

On Friday, April 19, repairs to the brick paved ramp on the south side of Hodson Hall will take place. The work will be completed in two phases so that access to the side door can be maintained. At some point, though, the side door will need to be closed for a short duration (one to two hours) to repair the brick pavers in front of it.

The logistics plan is here.