Weather permitting, a crane lift to move materials to the Wyman 1 roof is scheduled for Saturday, June 3. Pedestrian and vehicular traffic will be rerouted as necessary. The building will remain open during the work. Rain date is Saturday, June 10.
See the logistics plan here.