Construction activity at Bowman Drive and Wyman Park Drive

Starting Feb. 28 and continuing through March 30, construction to install underground utilities across Wyman Park Drive will cause brief traffic delays in both directions along Wyman Park Drive and when entering and exiting the South Garage. Flagmen will be on-site to direct traffic when lanes are closed.

To ensure safety, pedestrian traffic should follow the sidewalk routes that are clearly marked by signage to avoid the construction activity, and vehicles traveling on Wyman Park Drive and entering and exiting the campus.

Do not walk, jog, or ride bikes or scooters through the construction zone.