On Saturday, March 4, from 6 a.m. to 2 p.m., a crane will be set up next to Levi Hall for lifting equipment related to the Mudd-Levi-Bio Infrastructure Upgrades project. During this time, access to the west UTL entrance and the Levi lower- level entrances will be closed. The Mudd loading dock and the adjacent handicapped parking spaces will still be accessible during these hours.
If access to the listed entrances is required by critical personnel during these hours, please contact Mike Loester at loester@jhu.edu or 443-997-4457.